      Complete Guide to Parramatta Light Rail

      Parramatta Light Rail – the $2.4 billion project connecting Sydney’s west

      The Parramatta Light Rail project is a phased initiative aimed at delivering community creation and connectivity in Sydney’s thriving west. It is projected that over 50% of Sydney’s population will reside in Western Sydney by 2036, with plans for over 70,000 new homes to be built in the Greater Parramatta Region over the next 20 years. The Light Rail is a vital component in accommodating and mobilising this population, with the NSW Government estimating that around 28,000 people will utilise the service daily.

      The Government also projects that 130,000 residents will live within walking distance of a light rail stop. Dr Geoff Lee, Member for Parramatta and Minister for Skills and Tertiary Education, said: “This Parramatta Light Rail will bring people living in Greater Parramatta together with a safe and efficient public transport network. “It will improve connections to popular key destinations across the region, while also linking into Sydney’s greater public transport networks.” The project will be completed in two stages:

      1. Westmead to Carlingford, via the Parramatta CBD and Camellia. This will encompass 16 light rail stops along a 12 km stretch, including the new Powerhouse Museum, Bankwest Stadium, the Rosehill Gardens Racecourse, and three campuses of Western Sydney University (Rydalmere, Parramatta and Westmead). Early works have begun on this stage, with major construction works scheduled to start later this year and services projected to begin running in 2023.
      2. Parramatta CBD to Sydney Olympic Park. This stage is currently in the design phase and being evaluated for viability by the NSW Government prior to a funding decision being made. If approved, it will have between 10 and 12 stops along a 10 km stretch and connect with Stage 1. In addition to servicing communities in Ermington, Melrose Park and Wentworth Point, it will also provide a link to the Sydney Metro West, ferry services and heavy rail. The projected completion date for this stage is 2026.

      parramatta-light-rail-guide

      Projected to cost a total of $2.4 billion, the NSW Government has thus far committed $1 billion to the initiative from Rebuilding NSW and Restart NSW coffers. Estimates place job creation through the project at around 5,000 in total. The main objectives of the Light Rail project are to deliver:

      • A frequency of a service every 7.5 minutes during the peak 7am to 7pm weekday period
      • Reliable and extended hours of operation, running from early morning to late at night, seven days a week
      • Capacity to carry up to 300 passengers per vehicle (equating to approximately six standard buses)
      • State of the art, air-conditioned vehicles for comfortable travel

      What are the key dates in the Parramatta Light Rail project?

      The key dates in the project are as follows:
      • Stage 1 – Westmead to Carlingford: early works are underway and services on the line are projected to start running in 2023
      • Stage 2 – Parramatta CBD to Sydney Olympic Park: pending requisite approvals, the projected completion date of 2026

      Who is responsible for building the Parramatta Light Rail?

      Who is responsible for building the Parramatta Light Rail?
      • The project will be delivered under a number of contracts, with the main ones as follows:
      • Downer and CPB Contractors – construction of the light rail, valued at $840 million
      • Great River City Light Rail consortium (comprised of Transdev and CAF Rail Australia) – supply and operation of the network, building of the depot, power systems and light rail stops, valued at $536 million

      Where is the Parramatta Light Rail going?

      Upon completion of both stages of the Parramatta Light Rail, the line will stretch approximately 22 kms in length. Services opening in 2023 will provide transport between the following locations:
      • Parramatta Central Business District
      • Parramatta North Growth Centre
      • Westmead Precinct
      • Bankwest Stadium
      • Powerhouse Museum and Riverside Theatres
      • Camellia Town Centre
      • Rosehill Gardens Racecourse
      • Telopea
      • Western Sydney University campuses
      Stage 2 is an extension of the project and will connect the first stage to Sydney Olympic Park, Ermington and Wentworth Point. This will likely be completed in 2026. There’s no better way to stay across the latest industry and project news, than by subscribing to iseekplant’s Constructionsht blog!

      玻璃钢生产厂家焦作玻璃钢人物雕塑定做价格玻璃钢仿真雕塑定做贵州玻璃钢雕塑凳子成都玻璃钢仿真水果雕塑玻璃钢坐式如来佛雕塑北京玻璃钢动物雕塑徐汇区商场玻璃钢花盆山东常用商场美陈销售企业四川常见商场美陈供应丽江市玻璃钢雕塑驻马店玻璃钢雕塑设计玻璃钢雕塑书造型咸阳玻璃钢雕塑价格厂家山西景观玻璃钢雕塑端州玻璃钢人物雕塑公司福建通用玻璃钢花盆玻璃钢花盆好评评语河源透光玻璃钢雕塑工艺玻璃钢蝴蝶仙子雕塑吉林玻璃钢雕塑仿真牛定西景区玻璃钢雕塑设计天津河源玻璃钢动物雕塑林州玻璃钢雕塑报价商场美陈特装费用高不高四平玻璃钢雕塑工程报价大象玻璃钢雕塑设计厂家佛山玻璃钢卡通雕塑定制厂家商场的公区美陈淮南酒店玻璃钢花盆武威人物玻璃钢雕塑厂家香港通过《维护国家安全条例》两大学生合买彩票中奖一人不认账让美丽中国“从细节出发”19岁小伙救下5人后溺亡 多方发声单亲妈妈陷入热恋 14岁儿子报警汪小菲曝离婚始末遭遇山火的松茸之乡雅江山火三名扑火人员牺牲系谣言何赛飞追着代拍打萧美琴窜访捷克 外交部回应卫健委通报少年有偿捐血浆16次猝死手机成瘾是影响睡眠质量重要因素高校汽车撞人致3死16伤 司机系学生315晚会后胖东来又人满为患了小米汽车超级工厂正式揭幕中国拥有亿元资产的家庭达13.3万户周杰伦一审败诉网易男孩8年未见母亲被告知被遗忘许家印被限制高消费饲养员用铁锨驱打大熊猫被辞退男子被猫抓伤后确诊“猫抓病”特朗普无法缴纳4.54亿美元罚金倪萍分享减重40斤方法联合利华开始重组张家界的山上“长”满了韩国人?张立群任西安交通大学校长杨倩无缘巴黎奥运“重生之我在北大当嫡校长”黑马情侣提车了专访95后高颜值猪保姆考生莫言也上北大硕士复试名单了网友洛杉矶偶遇贾玲专家建议不必谈骨泥色变沉迷短剧的人就像掉进了杀猪盘奥巴马现身唐宁街 黑色着装引猜测七年后宇文玥被薅头发捞上岸事业单位女子向同事水杯投不明物质凯特王妃现身!外出购物视频曝光河南驻马店通报西平中学跳楼事件王树国卸任西安交大校长 师生送别恒大被罚41.75亿到底怎么缴男子被流浪猫绊倒 投喂者赔24万房客欠租失踪 房东直发愁西双版纳热带植物园回应蜉蝣大爆发钱人豪晒法院裁定实锤抄袭外国人感慨凌晨的中国很安全胖东来员工每周单休无小长假白宫:哈马斯三号人物被杀测试车高速逃费 小米:已补缴老人退休金被冒领16年 金额超20万