Measurement Book : Way to Write, Use, Format, Procedure & Measurement of Various Work

- Advertisement -
- Advertisement -

Table of Contents

 

A measurement Book may be defined as a record in which measurements are noted for the work accomplished by the contractor for goods or services delivered on the project work.

The Contractor payments are depend on the measurement mentioned on M-book.

Measurements are reported legibly in a serial way that transactions are readily traceable recordings of measurements.

Each collection of measurements should begin with entries

 

 


 

 

  1. Details in the Measurement Book  

Details that need to be noted in the MB sheet:

1. Date

2. Work Order No

3. Details reference number/boq number

4. location

5. Particulars

 

 


 

 

  2. Format of Measurement Book  

 

 

 


 

 

  3. Way to Prepare Measurement Book  

The way to prepare a measurement book is mentioned below:

a. First, note down the measurement date that was done.

b. BOQ no or details ref no is to know what measurement it belongs to and where it is carried.

c. The serial number of the new measurements is noted with the BOQ item number. Because it informs us of the new record of the exact item carried from, so the serial number of the BOQ item is good for quick confirmation.

d. And before reporting the measurement we should note the unit of measurement (UOM) for object measurement example,

i.  M3 or Cu.m. for volumetric measurements employed for work like excavation, concrete, etc.

ii.  M2 or Sq.m. for area measurements for work like painting work & plastering etc.

iii.  Running Meter or Rm for length measurement for standard or fixed-width items like pipelines etc.

iv. Nos or NO for no of items employed for work like taps & switch etc.

v. At last, note the measurement of each item in BOQ. With smallest dimensions & measurement for length 0.01 m, for area 0.01 m2, for volume 0.01 m3 in & for weight 0.001 tons

 

 


 

 

  4. Procedure of Recording Measurement Book  

The measurement book is recorded at two various stages as mentioned below:

a. Progressive measurement

b. Final measurement

 

a. Progressive Measurement

Progressive measurement is carried out in the completion of various stages of watershed action or before each running payment of the watershed action.

This bill is to be carried as the monthly bill in the task. Because a task job is a long-term process. So, monthly payment clearance needed monthly work progress of the contractor need for working payment requires progressive measurements needed.

The most significant purpose of maintaining progressive measurement would be for following the advancement of work and the output of work against the charge made.

It is essential to keep the progressive measurement book in both cases whether the work is being executed on a measurement basis or a daily pay basis.

 

b. Final Measurement

The final measurement is an entire measurement of some physical intervention, which can be registered at the duration of completion of any physical intervention.

The most essential goal of holding the final measurement would be to save all the measurements in one place. With the use of the final measurement, the true work done may be compared with the estimate done.

 

Progressive Measurement

 

 


 

 

  5. Measurement of Various Works  

Measurement of Excavation as mentioned in the drawing. The footing excavation job requires drawings like Footing location drawings and section drawings.

a. Measurement of Excavation

b. Measurement of Footing P.C.C.

c. Measurement of Footing R.C.C.

d. Measurement of Column up to Plinth Level R.C.C.

e. Measurement of Backfilling

f. Measurement of Plinth Beam R.C.C

g. Measurement of Grae Slab RCC

h. Measurement of Grae Slab RCC

i. Measurement of Brick Masonry

j. Measurement of In Side Plaster

k. Measurement of Out Side Plaster

l. Measurement of Ceiling Plaster

m. Measurement of In Out Side Plaster

n. Measurement of In Side Paint

o. Measurement of Out Side Plaster

 

 


 

  6. References  

1. Content Filter & Authenticity Checking Team, Dream Civil International

(Our team checks every content & detail to maintain quality.)

 


 

 

Read Also: How to Make Concrete Swimming Pool

 

- Advertisement -
Facebook
Twitter
Pinterest
WhatsApp
Email
Print
Copy URL
Latest Articles
Blog

Slump Test of Concrete | Lab Test Procedure

Articles

Quick Setting Cement : Working, Uses, Properties & More

Articles

Types of Valves With Images | Use of 5 Types of Valves

Articles

Types of Handrails Used in Bridge

Related Articles
Blog

What is Road Bitumen? : Properties, Classification, & Testing Methods

Niche Topics

Obligatory Points in Highway Alignment : With 2 Types

Niche Topics

What is Stone Dressing? : 5 Steps and Methods of Stone Dressing

Niche Topics

15+ Uses of Excavator

Advertisement

玻璃钢生产厂家贵州玻璃钢雕塑出售广州欧式玻璃钢卡通雕塑商丘仿铜玻璃钢雕塑厂家玻璃钢雕塑培训班哪家好山东大型商场创意商业美陈报价大型户外玻璃钢雕塑厂家价格定做玻璃钢浮雕雕塑甘肃仿铜西式玻璃钢雕塑玻璃钢果篮景观雕塑生产厂家西藏玻璃钢雕塑方案美陈雕塑图片 商场重庆佛像玻璃钢雕塑供应商沈阳市商场美陈辽宁玻璃钢彩绘雕塑玻璃钢雕塑造型厂家哪里有景观玻璃钢雕塑厂家哪家好玻璃钢雕塑用什么材料沈阳商场美陈公司济南玻璃钢雕塑价格山东周年庆典商场美陈有哪些玻璃钢卡通动漫雕塑厂家商场美陈猪睢宁玻璃钢造型雕塑青海玻璃钢景观雕塑卫辉玻璃钢雕塑价格精品玻璃钢花盆组合深圳通道商场美陈销售公司宣武区公园玻璃钢花盆上街区玻璃钢仿真雕塑潼南玻璃钢雕塑香港通过《维护国家安全条例》两大学生合买彩票中奖一人不认账让美丽中国“从细节出发”19岁小伙救下5人后溺亡 多方发声单亲妈妈陷入热恋 14岁儿子报警汪小菲曝离婚始末遭遇山火的松茸之乡雅江山火三名扑火人员牺牲系谣言何赛飞追着代拍打萧美琴窜访捷克 外交部回应卫健委通报少年有偿捐血浆16次猝死手机成瘾是影响睡眠质量重要因素高校汽车撞人致3死16伤 司机系学生315晚会后胖东来又人满为患了小米汽车超级工厂正式揭幕中国拥有亿元资产的家庭达13.3万户周杰伦一审败诉网易男孩8年未见母亲被告知被遗忘许家印被限制高消费饲养员用铁锨驱打大熊猫被辞退男子被猫抓伤后确诊“猫抓病”特朗普无法缴纳4.54亿美元罚金倪萍分享减重40斤方法联合利华开始重组张家界的山上“长”满了韩国人?张立群任西安交通大学校长杨倩无缘巴黎奥运“重生之我在北大当嫡校长”黑马情侣提车了专访95后高颜值猪保姆考生莫言也上北大硕士复试名单了网友洛杉矶偶遇贾玲专家建议不必谈骨泥色变沉迷短剧的人就像掉进了杀猪盘奥巴马现身唐宁街 黑色着装引猜测七年后宇文玥被薅头发捞上岸事业单位女子向同事水杯投不明物质凯特王妃现身!外出购物视频曝光河南驻马店通报西平中学跳楼事件王树国卸任西安交大校长 师生送别恒大被罚41.75亿到底怎么缴男子被流浪猫绊倒 投喂者赔24万房客欠租失踪 房东直发愁西双版纳热带植物园回应蜉蝣大爆发钱人豪晒法院裁定实锤抄袭外国人感慨凌晨的中国很安全胖东来员工每周单休无小长假白宫:哈马斯三号人物被杀测试车高速逃费 小米:已补缴老人退休金被冒领16年 金额超20万

玻璃钢生产厂家 XML地图 TXT地图 虚拟主机 SEO 网站制作 网站优化