ESR2 Cryoplant Utilities

Similar presentations


Presentation on theme: "ESR2 Cryoplant Utilities"— Presentation transcript:

1 ESR2 Cryoplant Utilities
ESR2 Preliminary Design Review Corey Butler Wednesday, June 19, 2019

2 ESR2 Primary Utility Commodities
The two primary utility commodities for ESR2 I will discuss are: WATER and AIR Primary Commodities

3 ESR2 Primary Utility Commodities
What ESR2 equipment requires cooling water? 1. Two Sullair 1st Stage Comprs – Approx 56 GPM ea 2. Two Sullair 2nd Stage Comprs – Approx 175 GPM ea 3. Two Recovery Comprs – Approx 30 GPM ea 4. Diffusion pump on Main Cold Box – Approx .25 GPM 5. Four turbines in the Main Cold Box System T1 – Approx 4 GPM T2 – Approx 3.2 GPM T3 – Approx .5 GPM T4 – Approx .7 GPM CRYO desires that the maximum flow rate not exceed 10 ft/sec. This will minimize erosion of the water piping and provide adequate cooling flow. Flow values were derived as follows: Main Stage Compressors: Using INPUT power and considering a 10K Delta T Turbines: Developed from break cooler numbers supplied by vendor It is imperative that the equipment listed above be adequately cooled such to protect it and lengthen it’s service. This equipment will generate heat which must be continually displaced by cooling water. Primary Commodities

4 What has facilities management provided for the ESR2 Cooling Water System?
Facilities management has provided Supply and Return Cooling Water Piping with isolation valves that loops inside of bldg at the southeast corner. ESR2 Cooling Water will be supported by the North Access Cooling Tower. Facilities management has indicated that they will provide labels for the SUPPLY and RETURN piping such that the headers can clearly be identified.

5 What does CRYO need to do to complete the water system?
Based on a P & I generated by CRYO, the piping will interface with existing valves provided by facilities management and be routed “to” and “from” the necessary equipment in the ESR2 compressor and cold box rooms. CRYO has developed a conceptual 3D model which illustrates how the piping can be routed to the equipment that requires cooling water. Based on gage pressures observed in field piping by Damon Rath and I, the CWS piping is shown BLUE and the CWR piping is shown RED.

6 Pictures of conceptual CWS & CWR piping from 3D model

7 Pictures of conceptual CWS & CWR piping from 3D model

8 Pictures of conceptual CWS & CWR piping from 3D model

9 Secondary Turbine Cooling Water Skid
A Secondary Turbine Cooling Water Skid is required to filter water that will be dedicated to the diffusion pump and four turbines located in the cold box room. This will be a closed loop water circuit that can be feed from the main cooling water system if necessary. This skid will be very similar as to what our JLab fabricators built for the SC1R 2K cold box using JLab drawings. CRYO will design this skid and generate a build to print drawing package. CRYO has designed and fabricated these type skids for CHL1 and CHL2. Line sizes are not currently shown on the associated P&I for this equipment but they will be added once the engineering analysis is completed. Even though this skid is not shown in this presentation it will look similar to the picture shown below for the SC1R 2K cold box. Talk Title Here

10 What we know about the Instrument Air System
We don’t have any of the equipment needed to support this system. Majority of the equipment will be vendor supplied. There will be MANY control valves which will require Instrument Air throughout the various plant systems. Piping will be fabricated by JLab technicians from build to print drawings. We have a good conceptual design which illustrates where we envision the Instrument Air equipment should be located and how the piping should be routed. This 3D layout is based off the existing CHL2 Instrument Air system which has a comparable demand. Pictures from the conceptual layout are provided on the following slides. What big equipment do we THINK we need to procure? Two Air Compressors Kaeser ASD 30 Series One 2,200 Gal Air Storage Tank One Heatless Desiccant Dryer Skid Kaeser KAD 165 Two Oil Mist Eliminators Kaeser OME 500 One Oil/Water Separator Kaeser KCF 50 Instrument Air equipment specifics

11 Pictures of conceptual Instrument Air equipment from 3D model

12 Pictures of conceptual Instrument Air equipment from 3D model

13 Pictures of conceptual Instrument Air equipment from 3D model

14 Conclusions: In this presentation I have shown that CRYO has a good conceptual idea of how the Cooling Water and Instrument Air systems can be installed at ESR2. Note that the piping and equipment shown are conceptual and are subject to change. All P&Is for the ESR2 Cooling Water and Instrument Air Systems have been made available for the PDR review committee at the link below All necessary long lead time equipment has been identified. Some equipment will be fabricated by JLab but the majority will be vendor supplied. Line sizes for system piping may not be shown on associated P&Is as the engineering analysis has not been completed. This information will be completed by FDR. State of the Union

15 End of the road THANK YOU

16 Corey Butler Wednesday, June 19, 2019


Download ppt "ESR2 Cryoplant Utilities"

Similar presentations


Ads by Google

玻璃钢生产厂家宜春玻璃钢雕塑价位玻璃钢学生雕塑广州玻璃钢仿铜人物雕塑番禺人物玻璃钢雕塑图片丽水玻璃钢雕塑价位丹阳玻璃钢雕塑生产厂家生产玻璃钢雕塑推荐货源张掖公园玻璃钢雕塑哪家好台湾玻璃钢仿铜雕塑玻璃钢春节节庆雕塑玻璃钢雕塑用什么喷漆会比较好北京玻璃钢仿铜雕塑定制供应阳江玻璃钢车雕塑汕尾玻璃钢人像雕塑图片青海彩色玻璃钢雕塑安装清远玻璃钢西瓜雕塑三水玻璃钢公仔雕塑图片高质量玻璃钢雕塑多少钱白银人物玻璃钢雕塑哪家好梅州透明玻璃钢雕塑河南不锈钢玻璃钢雕塑成都佛像玻璃钢雕塑订做价格制作玻璃钢雕塑公司深圳玻璃钢透光雕塑公司福建大型商场美陈厂家直销儿童玻璃钢雕塑报价多少玻璃钢雕塑开模上饶玻璃钢雕塑批发沈阳天河玻璃钢人物雕塑连云港玻璃钢仿铜雕塑厂家香港通过《维护国家安全条例》两大学生合买彩票中奖一人不认账让美丽中国“从细节出发”19岁小伙救下5人后溺亡 多方发声单亲妈妈陷入热恋 14岁儿子报警汪小菲曝离婚始末遭遇山火的松茸之乡雅江山火三名扑火人员牺牲系谣言何赛飞追着代拍打萧美琴窜访捷克 外交部回应卫健委通报少年有偿捐血浆16次猝死手机成瘾是影响睡眠质量重要因素高校汽车撞人致3死16伤 司机系学生315晚会后胖东来又人满为患了小米汽车超级工厂正式揭幕中国拥有亿元资产的家庭达13.3万户周杰伦一审败诉网易男孩8年未见母亲被告知被遗忘许家印被限制高消费饲养员用铁锨驱打大熊猫被辞退男子被猫抓伤后确诊“猫抓病”特朗普无法缴纳4.54亿美元罚金倪萍分享减重40斤方法联合利华开始重组张家界的山上“长”满了韩国人?张立群任西安交通大学校长杨倩无缘巴黎奥运“重生之我在北大当嫡校长”黑马情侣提车了专访95后高颜值猪保姆考生莫言也上北大硕士复试名单了网友洛杉矶偶遇贾玲专家建议不必谈骨泥色变沉迷短剧的人就像掉进了杀猪盘奥巴马现身唐宁街 黑色着装引猜测七年后宇文玥被薅头发捞上岸事业单位女子向同事水杯投不明物质凯特王妃现身!外出购物视频曝光河南驻马店通报西平中学跳楼事件王树国卸任西安交大校长 师生送别恒大被罚41.75亿到底怎么缴男子被流浪猫绊倒 投喂者赔24万房客欠租失踪 房东直发愁西双版纳热带植物园回应蜉蝣大爆发钱人豪晒法院裁定实锤抄袭外国人感慨凌晨的中国很安全胖东来员工每周单休无小长假白宫:哈马斯三号人物被杀测试车高速逃费 小米:已补缴老人退休金被冒领16年 金额超20万

玻璃钢生产厂家 XML地图 TXT地图 虚拟主机 SEO 网站制作 网站优化