Growatt SP2000 Installation Manual

Growatt SP2000 Installation Manual

Energy storage system
Hide thumbs Also See for SP2000:
  • Installation manual (43 pages)
Table of Contents
  • List
  • Table of Contents
  • Brief Introduction
  • Target Group
  • Prefa Ace
  • Prod Uct Descripti on
  • Safety Instructions
  • Safety
  • Purpose Use
  • Safety Measure
  • Symbols Introduction on the SP20000 Unit
  • Growatt SP 20000 Storage Unit
  • Product Label Explanation
  • Display and Labels of SP20000 Unit
  • Size and Weight
  • Description of Label
  • The Advantages of Growatt SP20000 Storage System
  • Unpackin Ng
  • Basic Installation Requirements
  • Installati Ion
  • Installation Layout
  • Insta Allation Instru Uctions
  • Installation of Energy Storing Machine
  • Installatiuon Guide
  • Storage System Application Schematic
  • Difference between Traditional Photovoltaic System and Storage System
  • Storage System Installation with Dual-MPPT Inverter
  • Installation Steps for Upgrading an Existing
  • PV System
  • System Electrical Connection
  • SP2000 AC Power Supply Connection
  • SP20000 PV Connection
  • Connection of Temperature Sensor for Lead-Acid Battery
  • Connection of Current Sensor
  • Connection of Hard Wired Monitoring
  • Battery Connection
  • Communication Connection between SP2000 and Lithium Battery BMS
  • Connection to Lead-Acid Battery
  • Recommendatory Connection
  • Grounding
  • Commissioning of Enegry Storage Machine
  • Operation Modes
  • Normal Charge Mode
  • Normal Discharge Mode
  • Fault Mode
  • Shutdown Mode
  • Shut T down
  • LED Display Area
  • Ach Status LED Light Indication Schematic
  • Battery Is Fully Charged
  • LCD Display Column
  • Accuracy of Measurements
  • Communication
  • Use the Plusbus Software to Set up the SP2000 Storage Controller
  • Monitoring the SP2000 Storage System
  • The Installation Environment, Maintenance and Cleaning
  • Start-Up the SP2000 Storage System
  • Shut down
  • Fault Finding
  • System Fault Information List and Troubleshooting Suggestions
  • Manufa Acturer war Rranty
  • Dismantling the Energy Storage
  • Packing the Energy Storage Machine
  • Storing Energy Storage Machine
  • Decomm Missioning
  • Product Specification
  • Product T Specifica Ation
  • DC Input Terminal Parameter
  • Specificatio N
  • Torque
  • Ap Pendix

Advertisement

           
                       
 
 
 
 
 
 
 
Insta
allation
 
 
                       
                       
n Man
ual Of
                       
                       
f Grow
watt SP
 
                      P
                       
 
 
 
2000 
Page 1/45
 
Previous Page

Advertisement

Table of Contents
loading

Summary of Contents for Growatt SP2000

  • Page 1                       P Page 1/45                                                              ...
  • Page 2 .......................... 6 6  2.2 Safe ety Measure .............................. 6 6  2.3 Sym mbols introduc ction on the S SP2000 unit ...................... 7 7  3 Product  Description n ......................... 8   3.1 Grow watt SP2000  .....
  • Page 3                       P Page 3/45                                                              ...
  • Page 4                         1 Brief In ntroductio on  1.1Prefac ce  This  manual will p provide the u users who us se the Growa tt SP2000 en nergy storage e system of G GROWATT NEW W  ENERGY  TECHNOLOG GY  CO.LTD.SH HENZHEN  (Sh hort  for  Grow watt  New  En nergy  as  belo ow) ...
  • Page 5 2. The insta allation of the e Growatt SP  2000 storage e system mus st only be car rried out by s uitably qualif fied installers s.  3. During  i nstallation,  n no  covers  or r  outer  casin ngs  should  b e ...
  • Page 6 S P2000  Storag ge  System n no other core e components s are required d.    Attention:  The  SP2000  Storage  sys stem  uses  Li thium  or  Le ead‐acid  batt teries  to  sto re  DC  electr ricity  from  t he  PV  panel ls.  Therefore, th he installatio...
  • Page 7 00 is reliable t to make sure  personal safet         2.3 Symb ols introd duction on n the SP20 000 unit  symb bol    d escription   ngerous voltag   k of burns!     nt of connect tion for ground ding protectio Dire ect Current(D Alte ernating Curre ent(AC) e SP2000 stora age unit comp plies with the  requirements s of the  plicable CE gu idelines ...
  • Page 8                                                 3 Produc ct Descrip ption  3.1 Growa att SP 200 00 storage e unit  Display an nd labels of SP2000 0 Unit Mark  Description  Explana ation  Tap  symbol  Tap to operate e SP2000 unit  (Detailed in s section 6) ...
  • Page 9                                                                         Description o of label:  Prod duct Model  owatt SP2000 0  Input  voltage range e  00‐580Vdc  Max i nput power r...
  • Page 10 This  mus st  be  reporte ed  immediately  to the suppli ier.    Growatt SP20 000 unit part ts and accesso ories are follo ows:      Chart 4. 1  Item m  umber  Description A ...
  • Page 11 HThe ambien nt temperatu re should be  within ‐25℃             I  The  SP2000 0  Storage  Un nit  can  be  in nstalled  in  ve ertical  or  lean ning  back  po osition,  but  n not  leaning  f forward  or  fl at  position. Plea ase refer to t...
  • Page 12       5.2.1 Insta allation Lay yout  The installati on plan for in nstalling the S SP2000 Syste em in a prope erty is as follo ows:  The  SP  2000 0  needs  to  b e  installed  n near  the  mai ns  entry  to  t the  property y.(The  red  lin ne  in  the  dia gram ...
  • Page 13                                                                         than it)  The SP2000  requires an A AC plug point t for AC powe er to the unit...
  • Page 14 Ф8 holes a 4. Drill four at the marked d points, the  depth is a mi inimum of 55 5mm.  Ф8 holes(As 5. Fix the fo our expansio n bolts intoФ s the chart 5. 5b below) 6. Hang the e SP2000 unit t on the four  fixings(As t the chart 5.5c c below)  7. Lock the  nut of setscr rew(As the  chart 5.5d be elow)  8. The who ole installatio n has finished d(As the ch art 5.5e belo ow)   ...
  • Page 15                     P Page 15/45                                                                ...
  • Page 16 5.3.1 Differ rence betw een Traditio onal Photov voltaic Syst tem and Sto orage Syste m  The  Growatt t  SP  2000  sto orage  system m  is  for  use  w with  single‐ph hase  grid‐con nnected  strin ng  inverters.  Up  to  3  equ ual  strings can b e connected ...
  • Page 17                                                                         In the above  the SP2000 u unit, the batt tery pack, and d the sensor ...
  • Page 18                                                                         Chart 5.10 Step 2: Conn ect the outpu ut of SP2000  to the input  of your PV in nverter, as th e diagram sh ow: ...
  • Page 19                                                                         Chart 5.13 ease note: A AN AC PLUG P POINT IS REQ QUIRED FOR T THE SP2000 U UNIT  5.4 System m Electric cal Connec ction  5.4.1    SP2 2000 AC pow wer supply ...
  • Page 20                     P Page 20/45                                                                ...
  • Page 21 MS system to o communica ate with the S SP2000 unit,  all the runnin ng  data  will  be  acquired  thr rough  the  co mmunication n,  so  temper rature  sensor r  is  not  need ed,  but  a  ne etwork  cable  is ...
  • Page 22                     P Page 22/45                                                                ...
  • Page 23                     P Page 23/45                                                                ...
  • Page 24                     P Page 24/45                                                                ...
  • Page 25 .5m.    5.4.7      Com mmunication  connection b between SP2 2000 and Lith hium battery’ ’s BMS  There  are  co ommunicatio n  between  S SP2000  and  lithium  batte ery’s  battery  managemen nt  system(BM MS),  so  a  RJ4 45  network cab le is required d to connect t the battery to o the COM so ocket of SP200 00. Installatio...
  • Page 26   Step  1.  Conn nect  the  pos itive  pole  of  lead‐acid  ba attery  to  the  positive  term minal  on  the e  SP2000  uni t,  connect  th he  negative  pol e  of  battery  to  the  nega ative  termina al  of  SP2000.
  • Page 27 , the battery  starts workin ng.      5.5 Groun nding  PV Array Gr rounding  The frame an nd mounting  racks of PV p panels should d be firmly an d securely co onnected to g ground.    DC Groundi ing  SP2000 storag ge system can n be used in b oth grounding g system and  floating syste em. If it is used d in grounding g PV system(P PV  positive or ne egative conne cted to groun nd), there mus st be a galvan nic isolation tr ansformer ins stalled betwe en inverter an nd ...
  • Page 28   1. Che eck  the  polar rity  of  PV  str ring  inputs,  t then  connect t  the  PV  strin ngs  into  the  SP2000’s  inp puts.  Keep  th he  buil lt‐in DC switc ch in OFF pos ition.  2. Con nnect  the  b battery  to  th he ...
  • Page 29 V generation  is low or stop pped, then th he system wil l operate nor rmal discharg ge mode.    ● When  D DC  input  volt tage  is  less  t than  100V  a nd  SP2000  u unit  has  dete ected  deman nd  from  the  property,  th he  controlle er will supply y energy from m the batterie es to the inve erter, which w...
  • Page 30                     P Page 30/45                                                                ...
  • Page 31       Chart 6.4     State four: w with the sunli ght being mo ore stronger,  the PV outp ut will be gre eater than pr roperty load  plus maximu m  charging pow wer of SP2000 0(2kW) ,  the r residual powe er will be fed t to the grid, po ower flow is sh how  as follow w:    Chart 6.5     Chart 6.6 Batt ery is fully ch harged     ...
  • Page 32 Chart 6.7       State  six:  wh hen  the  sun  goes  out  com mpletely,  the e  photovoltaic c  panel  will  n not  generate e  power,  Whe en  SP2000  ha as  detected elec ctricity being g supplied fro m grid, it wil l start discha rging to satisf fy the proper rty’s load,    Chart 6.8  ...
  • Page 33 :The SP2 5、 Fault sta 2000 unit has s detected a f fault, and sto opped operat ing.  6、 Program ming state: The SP2000  unit is being  programmed d.    The second l ine displays a as follow:  In  normal  sta atus,  it  scrol ls  automatica ally,  when  ta pping  on  the e  tap sign  are ea, ...
  • Page 34                                                 as billing.    6.4Comm munication n  6.4.1 Use  the PlusBu us software  to set up th he SP2000  storage con ntroller  The PlusBus  software can n be downloa ded from dow wnload sectio on of Growat tt official web bsite. ...
  • Page 35                     P P age 35/45                                                                ...
  • Page 36                           Chart 6.13   NOTICE: the  length of LAN N cable is dec cided by user rs themselves s according to o actual situat tion    7 Start‐u p and shu ut down  SP2000 s storage sy ystem  7.1Start‐u up the SP2 2000 stora age system m  1. Switch on  AC and DC is olator of the  inverter;  2. Plug the A AC power cord d of SP2000 in nto the wall s socket, it will ...
  • Page 37 If a fault occu urs with your r SP2000 Ene rgy storage sy ystem, please e inform Grow watt and be p prepared to p provide relate ed  information i in order to as ssist with fau lt deduction.   Our professi onal aftersale es service pe ersonnel will a assist you.    Typical inform mation that w will be neede...
  • Page 38                     P Page 38/45 5                                                                ...
  • Page 39 50W  for  10  well  inutes    10 Manu ufacturer  Warranty y  This certifica ate represent ts a 5 year w warranty for t the Growatt  products list ed below. Po ossession of  this certificat te  validates a st tandard facto ory warranty  of 5 years fro om the date o of purchase.   Warranted  products ...
  • Page 40 GROWATT , u unless such o other obligati ons or liabili ties are expr essly agreed   to it in writi ing signed an nd  approved  by y  GROWATT  ,  GROWATT  shall  have  n no  responsibi lity  or  liabilit ty  whatsoeve er  for  damag ge  or  injury  t to  persons or p roperty, or fo or other loss  or injury resu ulting from a...
  • Page 41   Warranty C Conditions  If a device be ecomes defe ective during  the agreed G Growatt facto ory warranty  period and p provided tha t it will not b be  impossible o r unreasonab ble, the devic ce will be, as s selected by G Growatt:  1、 Shi ipped to a Gr rowatt service e center for r repair; ...
  • Page 42   spec cification 12.1 Grow watt SP se eries energ gy storage e machine e product  specificat tion    Model Growat tt‐SP2000                                  Spec cification PV a rray input a and output  data :  Input t PV voltage e range ...
  • Page 43                     P Page 43/45                                                                ...
  • Page 44 Laun nchers of Com mmunication d data record  R00.0000601  gbee  M interface  00.0007000  Wi‐Fi  M interface  R00.0001400  uetooth  M interface  R00.0002200        13 Certif icate  Growatt SP20 000 apply wi thin the scop pe of the wor rld, So the inv verter have t o satisfy diffe erent countri es and region ns  of different s safety standa rds  del  Certificate e  Growatt  SP2000  CE,SAA,RCM M   ...
  • Page 45 5. Energy st torage mach ine Display co ontent  6. The man nufacturer an d model of th he battery  7.  Battery  capacity and  connection m mode    Growatt New w Energy Tech hnology Co.,L Ltd  Building B, J Jiayu Industri ial Zone, 28 G Guangming Ro oad, Longten ng Community y, Shiyan, Bao oan District, S Shenzhen  T:  + 86 75 55 2951 5888 8  F:  + 86 75 55 2747 2131 1 ...

This manual is also suitable for:

Sp 2000

Table of Contents

玻璃钢生产厂家来宾玻璃钢泡沫雕塑公司玻璃钢卡通雕塑设计公司公仔玻璃钢雕塑销售厂家山东季节性商场美陈批发广东节庆商场美陈采购玻璃钢字母座椅雕塑梅州发光动物玻璃钢雕塑摆件盘龙区玻璃钢雕塑报价绍兴玻璃钢花盆价格武义公园玻璃钢雕塑贵安新区玻璃钢雕塑定做电话广东玻璃钢海豚雕塑艺术摆件浦江人物玻璃钢雕塑定制杭州象山区商场美陈玻璃钢可妮兔雕塑北京玻璃钢花盆价格广西玻璃钢仿铜人物雕塑清尚雕塑玻璃钢作品福禄临门杞县定做玻璃钢雕塑厂报价单广西玻璃钢卡通雕塑海豚厂家倒酒玻璃钢雕塑视频玻璃钢功夫熊猫雕塑大兴商场美陈灯饰画价格河南景区玻璃钢雕塑订做价格唐山公园玻璃钢雕塑厂家四川个性化玻璃钢雕塑淮南玻璃钢雕塑安装南山园林玻璃钢人物雕塑深圳玻璃钢雕塑定做价格温州玻璃钢花盆设计香港通过《维护国家安全条例》两大学生合买彩票中奖一人不认账让美丽中国“从细节出发”19岁小伙救下5人后溺亡 多方发声单亲妈妈陷入热恋 14岁儿子报警汪小菲曝离婚始末遭遇山火的松茸之乡雅江山火三名扑火人员牺牲系谣言何赛飞追着代拍打萧美琴窜访捷克 外交部回应卫健委通报少年有偿捐血浆16次猝死手机成瘾是影响睡眠质量重要因素高校汽车撞人致3死16伤 司机系学生315晚会后胖东来又人满为患了小米汽车超级工厂正式揭幕中国拥有亿元资产的家庭达13.3万户周杰伦一审败诉网易男孩8年未见母亲被告知被遗忘许家印被限制高消费饲养员用铁锨驱打大熊猫被辞退男子被猫抓伤后确诊“猫抓病”特朗普无法缴纳4.54亿美元罚金倪萍分享减重40斤方法联合利华开始重组张家界的山上“长”满了韩国人?张立群任西安交通大学校长杨倩无缘巴黎奥运“重生之我在北大当嫡校长”黑马情侣提车了专访95后高颜值猪保姆考生莫言也上北大硕士复试名单了网友洛杉矶偶遇贾玲专家建议不必谈骨泥色变沉迷短剧的人就像掉进了杀猪盘奥巴马现身唐宁街 黑色着装引猜测七年后宇文玥被薅头发捞上岸事业单位女子向同事水杯投不明物质凯特王妃现身!外出购物视频曝光河南驻马店通报西平中学跳楼事件王树国卸任西安交大校长 师生送别恒大被罚41.75亿到底怎么缴男子被流浪猫绊倒 投喂者赔24万房客欠租失踪 房东直发愁西双版纳热带植物园回应蜉蝣大爆发钱人豪晒法院裁定实锤抄袭外国人感慨凌晨的中国很安全胖东来员工每周单休无小长假白宫:哈马斯三号人物被杀测试车高速逃费 小米:已补缴老人退休金被冒领16年 金额超20万

玻璃钢生产厂家 XML地图 TXT地图 虚拟主机 SEO 网站制作 网站优化